Permitting
6 min read
Why 40% of solar sites die in permitting, and how to see it in week one
Most consent failures trace back to overlays that were visible on day one. Here is how we weight them.

Written by
Veldt Research
Notes from the Veldt research team on grid, permitting, terrain and the business of getting land through diligence.
The overlays that matter
Protected habitat, floodplain and heritage overlays account for most of the consent failures we see. None of them are secret. They sit in public registers that nobody checks until a planning officer does. Veldt pulls every one of them the moment a boundary is drawn, and scores each by how often it has stalled a comparable project in the same jurisdiction.
Weighting by history, not by rule
A floodplain designation in one county is a formality. In another it is a two-year delay. We weight overlays by recorded outcomes, so a site in a strict jurisdiction scores lower even when the rulebook looks the same.
The result is a permitting score that tracks real outcomes. In our back-test across 1,200 surveyed sites, 94 percent of the risks Veldt flagged were confirmed by the consultant on the ground.